Site Overlay

CAMANAVA FLOOD CONTROL PROJECT PDF

An official of the Department of Public Works and Highways (DPWH) yesterday assured the public that the Camanava flood control project. Effectiveness of CAMANAVA Flood Control Project: A Case Study of Selected Flood Control Structures during Typhoon Gener and Monsoon Rains in August. The CAMANAVA flood control project may be completed before the year is over.

Author: Shakalar Mujora
Country: Bangladesh
Language: English (Spanish)
Genre: History
Published (Last): 21 September 2006
Pages: 229
PDF File Size: 9.65 Mb
ePub File Size: 19.11 Mb
ISBN: 528-8-22502-504-7
Downloads: 5969
Price: Free* [*Free Regsitration Required]
Uploader: Nazshura

If these concerns are not addressed in a transparent and scientific manner, one must question the motives for pushing through a project that is lacking in scientific preparation. It will probably not work as designed and will probably be a vehicle for huge corruption.

Any flood control plan is only as good as the quality of the topographic data flod in the modeling and planning. See Figures 1 and 2. Figure 1 shows the flood conditions year return without the infrastructure intervention, while Figure 2 shows the effect of the large flood control dam, which has ostensibly reduced the flooding. What is wrong with Figures 1 and 2?

Many details are missing, suggesting that the planning was not thorough.

For example, flooding coming from the San Juan River, which has its own watershed, is not considered, among many other things. Compare this with the Project Noah National Operational Assessment of Hazards flooding scenario in Figure 3, which incorporates the most accurate topographic survey done in the metropolis using Lidar light detection and ranging data. What is immediately obvious is that the flooding scenario is not as simple as the previous figures show.

The proposed large dam flood control program is not designed properly because the flood model it is using is obviously substandard.

This means that the infrastructure that will be done will not address sufficiently and properly the flooding. Why was the plan budgeted with a poor flood model? If the flood model basis is wrong, then how was the Pbillion estimate done?

Note that with a more accurate flood model, the interventions can be focused so that only the most threatened areas are addressed. Lidar data for Metro Manila, which are the most accurate, have been available only the past two years and already used by Noah for flood projections.

It does not take a rocket scientist to figure out that the Noah projections are much more accurate.

contdol WHAT is immediately obvious is that the flooding scenario is not as simple as the previous figures show. To top this all, Project Noah recently received a letter from the World Bank asking it to provide only now the flood projections it has made.

This after the Pbillion project was approved by Neda.

The proposed project aims to address urban flooding folod critical catchments as part of the long-term Metro Manila Flood Management Master Plan that was approved by the Neda Board in September In view of this, camxnava would like to request a copy of Project Noah data on flood risks. We would like to specifically request the shape files of the flood maps for the various return periods as shown in the Project Noah website. Our water specialist, Mr. This looks like the Pbillion project will be taken out as a loan, to be paid by the Filipino people.

  ELCAD MANUAL PDF

This is too much money to be spent when the details available now show that at best the plans are not based on the best data available. Have these been vetted? In contrast, Project Noah is barely 3 years old and has already made enormous impact on disaster prediction, with its results verified with actual data. Can projecf same be said of the numerous flood control priject designed under Jica? Street flooding in the metropolis after short but intense rainfall can cause havoc in terms of flooding, traffic and disrupted lives.

CAMANAVA flood control project, ‘di naging epektibo laban sa baha

Work at the University of the Philippines National Institute of Geological Sciences and Project Noah, using detailed Lidar data, can predict localized flooding due to short-duration intense rainfall.

The immediate consequence of this is that engineering intervention e. Any flood control program looking only at Laguna de Bay will be myopic and will be very difficult to implement. The bulk of this flood control program, a Pbillion dam in the Montalban area, may not be able to accommodate upstream river excess discharge. Thus, any comprehensive flood control plan in this area must include a way to reduce extreme rainfall-related river discharge flowing into the Marikina River, which is the greatest source of discharge into the Laguna de Bay.

If flood measures are constructed only at the lowest elevations i. Flood control plans that will involve large dams in the Montalban watershed should also consider the existence of active faults in the area and the very large watershed areas that will be promect to accommodate the dam water.

In the Marikina-Montalban watershed, the possibility of capture tunnels to reduce the discharge of floodwater flowing into Marikina and returning the captured water volume to the Sierra Madre divide for discharge eventually to the Flood Ocean should be studied carefully.

This solution should be cheaper and could be integrated in the overall scheme of flood water management, resulting in a much lesser discharge of floodwater into the metropolis, which would reduce the kind and amount of intervention.

These capture tunnels might be more feasible than a proposed solution of making a channel from the Marikina Valley directly to the Manila Bay, potentially running over infrastructure and residents.

President Aquino was justified in canceling the Pbillion Laguna de Bay dredging contract which, not only was technically flawed, but also would not have served to control flooding in the metropolis. Even if the republic was sued because the contract was already fraudulently signed during the Arroyo administration, this reveals the criminal modus operandi of crafting billion-peso projects, using foreign consultants to justify the padded and substandard designs, and financing the projects with sovereign loans that the Filipino people will be paying in the long term.

  CONEPATUS LEUCONOTUS PDF

This is probably the reason why Mr. Aquino mentioned in his State of contgol Nation Address that large-ticket items must be vetted and that competent Filipino engineers and scientists at least comment on the technical feasibility studies and do the requisite modeling before money is borrowed and flokd. My testimony at the Philippine Republic vs Baggerwerken trial in Washington international arbitration case in the World Bank, regarding the fraudulent P8-billion Pasig dredging project and the proposed Pbillion Laguna de Bay dredging project showed that very little technical vetting was done.

The testimony was considered crucial by both the Philippine and American lawyers for the Philippine position. The Philippine position was weakened because the lack of vetting was probably intentionally done to promote corruption.

A most important lesson learned from the Washington trial is that these cases are best avoided by doing camnava technical vetting beforehand—before contracts and notices to proceed are signed and implemented. Despite the best intentions, Neda does not have the wherewithal to do thorough technical vetting, especially for large-ticket projects.

We should end this rapacious cycle of creating substandard projects to be funded by sovereign loans from foreign banks that bring their own consultants who will flod be looking out for genuine Philippine interests. There are enough competent Filipino engineers and scientists who are honest and cqmanava.

They should help vet these projects and help stop this great corrupt leakage of funds that could have been used otherwise to build more classrooms, and other really needed and worthy infrastructure. Arcilla, MSc and Ph.

He cmaanava be reached at caloy. We use cookies to ensure you get the best experience on our website. By continuing, you are agreeing to our use of cookies.

To find out more, please click this link. Yearend thoughts on the AFP.

TIMELINE: The Camanava flood control project

Metro Manila Flood Control Plan. Don’t miss out on the latest news and information. For feedback, complaints, or inquiries, contact us. Fireworks illuminate the skies despite the rain January 01, We reserve the right to exclude comments which are inconsistent with our editorial standards.